Step 1 of 8

Welcome to Planifly!

Let us show you around our powerful planning tools. This quick tour will help you get the most out of our platform.

Heritage

Listed Building Consent Guide

Navigate the complex world of listed building alterations, from Grade I to Grade II properties and heritage impact assessments.

14 min read
HeritageLast updated: December 2024

Listed Building Protection

Listed buildings have statutory protection under the Planning (Listed Buildings and Conservation Areas) Act 1990. Unauthorized works can result in criminal prosecution and unlimited fines.

Always obtain Listed Building Consent before starting any works that affect the character or appearance of a listed building.

Understanding Listed Buildings

Listed buildings are structures of special architectural or historic interest that are protected by law. There are approximately 400,000 listed buildings in England, ranging from ancient monuments to 20th-century architecture.

Listing Grades

Grade I

2.5%

Buildings of exceptional interest, sometimes considered to be internationally important.

  • Highest level of protection
  • Extremely rare alterations permitted
  • Examples: Westminster Abbey, Tower of London

Grade II*

5.8%

Particularly important buildings of more than special interest.

  • Very high level of protection
  • Limited alterations considered
  • Examples: St. Pancras Station, Royal Festival Hall

Grade II

91.7%

Buildings of special interest, warranting preservation efforts.

  • Standard level of protection
  • Most common listing grade
  • Sympathetic alterations possible

What's Protected?

Listing protects both the interior and exterior of a building, including any structures within its curtilage (such as boundary walls, outbuildings) that were built before 1948.

Historic listed building facade

The Application Process

1

Pre-Application Research

Understand the building's history, significance, and listing details.

  • Check the National Heritage List for England
  • Research building's history and development
  • Identify significant features and fabric
  • Review local planning policies
2

Engage Heritage Professionals

Work with specialists experienced in listed buildings.

  • Conservation architect or accredited specialist
  • Heritage consultant for impact assessment
  • Specialist craftspeople and contractors
  • Archaeological specialists if required
3

Pre-Application Advice

Seek formal pre-application advice from the local authority.

Importance: Essential for listed buildings to establish principles before detailed design

4

Prepare Heritage Impact Assessment

Document the building's significance and assess impact of proposals.

Key Components: Statement of significance, impact assessment, justification for works, mitigation measures

5

Submit Application

Submit Listed Building Consent application with supporting documents.

  • Application form (no fee for LBC)
  • Detailed drawings (existing and proposed)
  • Heritage Impact Assessment
  • Design and Access Statement
  • Specialist reports (archaeological, structural, etc.)
6

Determination

Local authority assesses application with input from conservation officer.

Timeline: 8 weeks standard, but often longer for complex cases

Heritage Impact Assessment

Critical Document

A Heritage Impact Assessment (HIA) is the most important document in your application. It demonstrates your understanding of the building's significance and justifies your proposals.

Key Components

Statement of Significance

Detailed assessment of the building's heritage value.

  • Historical development and context
  • Architectural and aesthetic value
  • Archaeological interest
  • Communal value and social history
  • Identification of significant elements

Impact Assessment

Analysis of how proposals affect the building's significance.

  • Direct physical impacts on fabric
  • Visual and aesthetic impacts
  • Impact on setting and context
  • Temporary vs. permanent impacts
  • Cumulative impacts with other changes

Justification

Clear rationale for why the works are necessary.

  • Public benefits of proposals
  • Necessity for building's continued use
  • Structural or conservation requirements
  • Exploration of alternative approaches
  • Balancing harm against benefits

Mitigation Measures

Steps taken to minimize harm to heritage significance.

  • Design modifications to reduce impact
  • Use of traditional materials and techniques
  • Recording and documentation of affected features
  • Salvage and reuse of historic materials
  • Interpretation and public engagement

Best Practice Principles

✅ Do

  • Understand the building before designing
  • Use traditional materials and techniques
  • Retain and repair original features
  • Make interventions reversible where possible
  • Document the building before and during works
  • Engage experienced heritage professionals

❌ Don't

  • Remove original features or fabric
  • Use cement-based materials on traditional buildings
  • Install standard modern fittings
  • Apply modern standards rigidly
  • Start work without consent
  • Assume minor works don't need consent

Conservation Principles

  • Minimum Intervention: Do as much as necessary, but as little as possible
  • Reversibility: Changes should be capable of being undone without harm
  • Authenticity: Preserve the building's authentic character and fabric
  • Legibility: New work should be distinguishable from historic fabric
  • Compatibility: New materials should be compatible with existing

We use cookies

We use cookies to enhance your experience, analyze traffic, and for personalization. See our Cookie Policy.